Commercial: AmSpec Growth Unit

What we did:

This project included the remodelling and refurbishment of an existing building to provide a state of the art laboratory, secure external compound and office facilities to test fuels for the Petrochemical Industry in Pembrokeshire.

Client:

AmSpec

Works completed:

  • Internal remodelling to create a mezzanine floor to house the office accommodation.
  • Remodelling of main entrance.
  • Creating new laboratory, soundproof room, fuel-testing bays and concrete stands for the testing equipment.
  • Internal refurbishment, including mechanical, electrical, ventilation, resin flooring and decoration.
  • Civil works including secure fencing, hard standing for deliveries and installing an interceptor to the drainage system to capture fuel spills and landscaping.

Key things we had to consider:

  • The site is used to test petrochemical fuels, so health and safety is paramount

Building standards we worked to:

  • LABC (Local Authority Building Control)

  • 576.14 tonnes of waste diverted from landfill.

Duration:
30 weeks
Completion:
June 2019
Fair payment targets achieved:
100%
Other:
New local sub-contractors appointed and continuing as part of our supply chain
left arrow
right arrow
We recently completed our first UK project in Pembrokeshire, West Wales (June 2019), building offices and a petroleum testing laboratory, requiring all kinds of M&E infrastructure to comply with Health, Safety and Environmental requirements. Work began early Jan 2019, and from the outset, it was very clear that Rob Charles and Paul Lloyd had everything under close control. From competitive pricing from suppliers to organising timings of other trades/contractors on site, their proactivity and commitment to fast track our project was clear to see and very reassuring, giving us peace of mind. Their collaborative working and client focus was definitely key to ensuring our build stayed on time and also on budget.

During our build, a few significant challenges occurred which could not have been foreseen, which had the potential to delay the project and/or blow the budget. The way that Lloyd & Gravell handled these challenges calmly and methodically, resolving them with the most cost-effective and timely solutions, was very impressive. We have found their workmanship to be of the highest standard, and it is clear that they have great pride and attention to detail in everything they do. We would happily recommend them for any project in the future. We are very grateful for our project being delivered both on time and within budget.
Country Manager UK
/
AmSpec